CETI Campus · Koupéla

A Dignified & Inspiring Living Environment
for Tomorrow's Talents

Two complementary projects to offer CETI students and trainers a quality, secure and autonomous residential environment — in the heart of Burkina Faso.

78 autonomous studios
100 persons max
Solar energy
Autonomous borehole
Two projects to fund

CETI Campus Projects

A residential complex to house learners and trainers, complemented by a lively living space for campus well-being and cohesion.

Project 1 CETI residential complex – G+1 building 78 studios

Residential Complex
Students & Trainers

A G+1 building structured in two wings connected by a central core, housing 78 autonomous studios of 12 m² — each equipped with a private bathroom, storage space and study furniture. The complex is designed for full autonomy in water and energy.

78 Studios 12 m²
~1,185 m² Usable area
105.3M FCFA · Budget
7 months Construction time
View details
Project 2 Campus Life Complex CETI – Aerial conceptual view

Leisure Complex
Campus Life Hub

A lively communal space located in the heart of the campus, directly adjacent to the residential complex. Restaurant, multipurpose hall, theatre, sports area and landscaped areas — designed to accommodate up to 100 people simultaneously with frugality and efficiency.

100 Simultaneous capacity
6 spaces Dedicated facilities
25.9M FCFA · Budget
4–5 months Construction time
View details
Project 1 — Residential

78 Studios Designed for Excellence

Each studio is a standardized, functional and comfortable space, designed to promote concentration and rest for learners.

Plans and elevations — CETI residential complex

Each Studio is Equipped

The 78 units are distributed in two wings (39 per block), with 1.20 m external walkways providing natural ventilation and easy circulation.

  • Private bathroom

    2.5 m² dedicated — privacy and hygiene guaranteed for each resident

  • Integrated study space

    Study table, chair and storage included in each 12 m² unit

  • Solar energy autonomy

    Photovoltaic panels, inverters and batteries — zero grid dependence

  • Borehole & water towers

    Borehole with pump and 2 × 5,000 L — water available permanently

  • Secure environment

    Fencing, external lighting, peripheral drainage and pedestrian paths

Construction Schedule — 7 Months

M1
Studies & Foundations

Earthworks, layout, foundations

M2
Ground Floor Walls

Wall elevation, upper ground floor slab

M3
Upper Floor & Borehole

Upper floor walls + borehole drilling

M4
Roofing

Framework, roofing and waterproofing

M5
Finishing Works

Plastering, joinery, networks

M6
Equipment

Sanitary, solar, tiling, water towers

M7
Handover

Painting, furniture, exterior landscaping, key handover

Project 2 — Leisure

The Campus Life Hub

A lively, compact and friendly living center, designed to enrich the daily life of residents and strengthen the community dynamics of the CETI campus.

6 Spaces for Campus Well-Being

Restaurant

55 meals/day service, drinks and snacks — the heart of campus social life

Multipurpose Hall

Conferences, workshops, cultural events — a flexible community space

Theatre

Performances, screenings, dances — an open artistic expression space

Sports Area

Outdoor sports areas for physical well-being and learner cohesion

Green Spaces

Landscaped areas and gardens for relaxation and outdoor conviviality

Communal Sanitary Facilities

Sanitary blocks dedicated to common areas — hygiene and comfort ensured

Schedule — 4 to 5 Months

A short, well-reasoned construction with local materials and proven techniques

M1–2
Foundations & Structure
Earthworks, masonry, load-bearing structures
M3
Roofing & Joinery
Structural framework, aluminium/wood, natural ventilation
M4
Finishing & Equipment
Washable floors, networks, sports equipment
M5
Landscaping & Handover
Landscaping, furniture, fencing, key handover
On-site integration

An Integrated & Coherent Campus

Both complexes are designed to function together, adjacent on the CETI grounds — ensuring architectural consistency and service synergy for all residents.

Call to Builders — Diaspora & National Investors

These two projects are waiting for
your commitment
to come to life.

Burkinabè diaspora — in Paris, Brussels, Montreal, Washington — your success abroad can become the foundation for the success of thousands of young people at home. National investors — entrepreneurs, civil servants, merchants — the time to go from spectator to builder has come.

These two construction projects are concrete, costed, deliverable in 4 to 7 months. Not an idea. A construction site. A founding act.

Project 1

Residential Complex
Students & Trainers

105.3M FCFA
78 studios · ~1,185 m² · 7 months
Dignified accommodation for 78 learners and trainers. Solar energy, borehole, two 5,000 L tanks. A setting that respects those who learn.
Support this project
Project 2

Campus Life Hub
Leisure & Campus Life

25.9M FCFA
100 persons · 6 spaces · 4–5 months
Communal restaurant, gym, theatre, relaxation spaces. The soul of the campus. The well-being of learners is not a luxury — it is a condition for success.
Support this project
"We are not building walls. We are building destinies. Every studio built is a young person who sleeps in dignity and rises to learn. Every shared living space is a community bonding together. This is Africa building itself, brick by brick, by ourselves."
— KABORE Alain Noel Kibsa, Initiator of the CETI Project
Fill in the investor form Become a CETI shareholder
Campus Investor Form

Invest in the construction
of the CETI campus

This form is for people wishing to directly participate in the financing of the construction of the Residential Complex or the Campus Life Hub. It is mandatory to be a CETI shareholder (min. 20 shares) before selecting a campus project.

Prerequisite
20 shares
minimum · 1 share = 50,000 FCFA
= 1,000,000 FCFA (≈ €1,524)
If you are not yet a shareholder, check the corresponding box in the form — the CETI team will guide you through both steps.
What your commitment funds
Project 1 — Residential Complex
78 studios of 12 m², solar energy, borehole · 105.3M FCFA total · 7 months
Project 2 — Campus Life Hub
Restaurant, sports, theatre · 25.9M FCFA total · 4–5 months
Residential Study Campus Life Plan

Campus Investor Form

Choose your project · The CETI team contacts you within 48h

Personal Information
Contact Details
CETI Shareholding (prerequisite)

Are you already a CETI shareholder? (min. 20 shares · 1,000,000 FCFA)

Campus Project Choice (required)
Planned contribution
Preferred payment method

Secure data · Never shared · Processed within 48h

Technical documentation

Complete Studies Available

Download the detailed studies for each project

Feasibility Study — Residential

78 studios · 105.3M FCFA · Peter Kum — April 2026

Investment Plan — Campus Life

Restaurant, sports, theatre · 25.9M FCFA · 4–5 months